September 26, 2017

HVDC Cable: Meols not preferred landfall site

hvdc landfall meolsFurther to the news that the proposed HVDC cable could come ashore at a landfall site in Meols, energy company SP Transmission announced in July that the preferred landfall location is at Leasowe.

In a news item on their website, SP Transmission said: “At our information event in February we presented two possible landfall locations for the cable to come ashore on the North Wirral coast: Dove Point (Meols) and Leasowe.┬áThese options have now been considered in detail and a landfall at Leasowe has been identified as the preferred option. The attached fact sheet describes how this decision was reached.”

The fact sheet detailing the decision process is available in pdf format.

Speak Your Mind

*